Pinecone Matches INIBOX Hosting in Tier III+ Data Center
ASIC Miner Hosting in the Data Center – Reliable, Transparent and Scalable
Plug Into Powerful 95%+ Uptime Infrastructure and Maximize Your Mining Efficiency
Get the most out of your mining hardware with Jingle Mining turnkey hosting solution in a balance between reliability and cost, making it a popular choice for many organizations that cannot afford significant downtime but are not looking for the highest tier of fault tolerance.
📦 Jingle Mining Hosting Service Overview
| Hosting Location | Tier III+ Data Center |
| Electricity Rate | $0.079 per kWh |
| One-Time Installation Fee | FREE |
| Power Infrastructure | Industrial-grade, high-capacity data center |
| Connectivity | 24/7 monitored Ethernet uplink |
| Climate | Constant temperature and humidity |
| Setup Time | T+3 Working day |
| Uptime | 95%+ |
| Miner Description | |
| Device | Pinecone Matches INIBOX |
| Hashrate | 850Mh ±5% |
| Power on wall | 500 W |
| Warranty | 6 Month |
| Customs Duty | Included |
| Shipping Fee | Included |
| Electricity Deposit | $30 per miner |
| Minimum Order Quantity (MOQ) | 1 miner |
🔧 Included Features & Services
✅ No hidden fees
✅ Professional Rack Mounting & Setup
✅ Energy-Efficient Cooling Infrastructure
✅ Real-Time Monitoring of Hashrate
✅ 95%+ Uptime Guarantee with Redundant Power Systems
✅ Optional Maintenance & Repair Services
✅ Robust Network Security & Facility Access Controls
💡 Why Choose Jingle Mining Hosting Service?
- ⚡️ Reliable and Transparent Infrastructure
- 💰 Low-Cost Electricity Paired with Full-Service Hosting
- ⚡️ 1 working day Fast delpoyment
- 🔌 Ready-to-Go Setup for New & Experienced Miners
- 🧊 Constant temperature and humidity for device longevity
- 🔒 Official distributor of the hardware manufacture
❓ FAQs
Q: What miner models are accepted?
As of now, the only device available for hosting services is the Fluminer L1 Pro 6G,Fluminer T3,Pinecone Matches INIBOX.
Q: How are electricity fees calculated?

You’re billed monthly based on actual KWH usage at the stated $0.079 rate.
Q: How can I withdraw my hardware?
The hosting service contract term is 6 month from the order effective date. The electricity deposit could be returned within 7 days after the client terminates the service, provided that all bills and other charges have been paid.
Q: How can I get mining started?
Please provide your viabtc mining account info. Our operation team will configure the equipment to your address within one business day of the order being generated.





Wechat
Telegram
Twitter
Discord